Shenzhen Bay Copy04
项目描述
This project involved the fabrication of a 20-meter tall stainless steel sculpture, designed by [Architect Firm].
The primary challenge was ensuring seamless welds across complex curves and meeting the stringent seismic codes.
The Challenge
Our team received the architect's 3D model and immediately identified key challenges in transportation and on-site assembly.
The "zero-risk" translation of the digital form into a physical, load-bearing structure was critical.
Our Solution
We employed advanced 5-axis CNC forming for the primary ribs and developed a custom jig system for assembly.
Our in-house engineering team optimized the internal structure, reducing steel usage by 15% while increasing rigidity.